• Feasibility study on scrapped rail project
  • Fauwaz Abdul Aziz
  • 1163066275
  • The Economic Planning Unit (EPU) and Ministry of Finance have been given two months to study the proposal by the Malaysian Mining Corp (MMC) and Gamuda to build a double track electrified railway line, expected to cost RM9 billion.

    • EPU, MOF to study the proposal
    • Looking into the financial aspect