Penans tighten Murum dam blockade noose
The Penans tightened their blockade of the Murum dam construction by cutting off another linkage road to the dam site starting on Thursday, thus paralysing the transportation of building materials worth hundreds of thousands of ringgit.
The new blockade was set up on an old narrow logging road through an oil palm plantation, passable only for four-wheel drive vehicles.
For the rest of this story and more, subscribe for only RM150 a year. If you're already a subscriber, please sign in.
Sign in Subscribe now