Malaysia plans to build two nuclear power plants that will generate 1,000 megawatts each with the first plant ready for operation in 2021 and the second plant, a year later, as part of the overall long-term plan to balance energy supply.
Malaysia plans to build two nuclear power plants that will generate 1,000 megawatts each with the first plant ready for operation in 2021 and the second plant, a year later, as part of the overall long-term plan to balance energy supply.