Minister instructs immediate inspection of cracks on KL flyover
Works Minister Alexander Nanta Linggi, in a post on X, said the safety of all quarters, especially road users, must be prioritised.
He said this in response to a post on X that pointed out...
The Malaysian Highway Authority (LLM) and the Setiawangsa-Pantai Expressway (SPE) concessionaire were instructed to inspect cracks on the Jalan Cheras flyover immediately.
Works Minister Alexander Nanta Linggi, in a post on X, said the safety of all quarters, especially road users, must be prioritised.
He said this in response to a post on X that pointed out the increasingly visible cracks on the flyover.
“I take this matter seriously,” he said.
The SPE, fully opened on Nov 3 last year, features a dual-two-carriageway and seven elevated interchanges.
The expressway is divided into four main sections: Kerinchi – Salak (Section 1), Salak – Pandan (Section 2), Pandan – Setiawangsa (Section 3) and Setiawangsa – Taman Melati (Section 4), spanning 20.7km in total.
It connects several other highways, including the Sprint Highway, Ampang-Kuala Lumpur Elevated Highway (Akleh), Duta-Ulu Kelang Expressway (Duke), and the Kuala Lumpur Middle Ring Road 2 (MRR2), to enhance network efficiency and reduce congestion in Kuala Lumpur.
- Bernama
/file/publisher-c1a3f893382d2b2f8a9aa22a654d9c97/2024/06/470a872ec802ae2869231f851bd163c2.jpg)


/file/publisher-c1a3f893382d2b2f8a9aa22a654d9c97/2023/01/648c93d272f86ccb6793df01d58b14b7.jpg)
Are you sure you want to delete this comment?
This action cannot be undone.