Written guarantee sought to stop Baram Dam project
Coinciding with the second anniversary of the Baram blockade, We, the 24 civil society groups signing this statement, strongly demand the state government of Sarawak to immediately stop the Baram Dam development project with a written guarantee and to stop encroaching on Native Customary Land.
Although Chief Minister Adenan has verbally instructed the suspension of this project, the people of Baram would continue their resistance movement until the final written guarantee is presented by the state government.
We would like to reiterate that the local villagers have never been consulted prior to commencement of the dam project. It indicates a violation by the state government of the development principles of ‘Free, Prior, Informed and Consent’ stated in United Nations Declaration on Rights of Indigenous Peoples.
This mega dam project would force twenty thousand indigenous people to relocate, and annihilate heritages and cultures. An area as large as Singapore would be flooded, posing a long-term environmental destruction. Not only should the state government halts the Baram dam project, all 12 mega dam projects proposed under the Sarawak Corridor of Renewable Energy (Score) should also be canceled.
Baram people have been stationing at the two camps, namely Long Lama and KM15 in the past two years to prevent staff and contractors of Sarawk Energy Berhad (SEB) from going into the project construction site. Last year at Km15, fourteen confrontations with SEB occurred in three months, during which SEB personnel were expelled and machines were moved away. A huge hole was also dug at the main road heading to the construction site.
The state government must recognise the perceived meaning of ‘development’ by indigenous villagers. They would never accept any forms of exploitation of natural resources, let alone their ancestral land and rivers. They demand a sustainable development - provision of basic infrastructures and democratic life without sacrificing environmental ecology and culture.
Therefore the mega dam project at rural Baram should be replaced by construction of amenities (roads, schools and hospitals), as well as supplying electricity and clean water.
Signatories:
1. Baramkini
2. Damn the Dams Action Group
3. Teoh Beng Hock Trust for Democracy
4. Pusat Komas
5. Centre for Orang Asli Concerns
6. Institut Rakyat
7. Rainbow Genders Society
8. Institute for Development of Alternative Lifestyle (Ideal)
9. Civil Rights Committee of KL & Selangor Chinese Assembly Hall
10. Malaysian Youth and Students’ Democratic Movement (Dema)
11. Persatuan Masyarakat Selangor & Wilayah Persekutuan (Permas)
12. Tindak Malaysia
13. Suara Rakyat Malaysia (Suaram)
14. Sahabat Rakyat
15. Malaysians Against Death Penalty and Torture (Madpet)
16. Save Rivers
17. In Between Cultura
18. Community Information and Communications Centre (Cicom)
19. Bukit Bandaraya Residents Association
20. Focus On Sarawak
21. Aliran
22. Johor Yellow Flame (JYF)
23. Sunflower Electoral Education (Seed)
24. Ban Cyanide Mining in Raub


Are you sure you want to delete this comment?
This action cannot be undone.