DID stops releasing water as Perlis braces for El Nino
The Perlis Drainage and Irrigation Department (DID) has stopped releasing water from the Timah Tasoh Dam, Beseri to padi fields to cater solely for domestic consumption as the state braces for the second wave of dry spell due to the El Nino phenomenon.
For the rest of this story and more, subscribe for only RM150 a year. If you're already a subscriber, please sign in.
Sign in Subscribe now